Every time a Q2-close ERP freeze lifts, batched material master and BOM changes hit the floor all at once — and MES quietly falls out of sync. Here’s a repeatable pre-flight and post-sync checklist to catch it before it causes scrap or blocked orders.
Read MoreMonth: July 2026
Critical Manufacturing, Plex, or FactoryTalk: Picking the Right Rockwell MES in 2026
Rockwell now owns three overlapping MES products. Here’s a practitioner framework for deciding which one — if any — actually fits your line, instead of defaulting to the badge on your drives.
Read MoreYour Predictive Maintenance Alert Doesn’t Become a Work Order by Magic
The bottleneck in closed-loop predictive maintenance isn’t the vibration or thermal model — it’s whether MES can supply enough context to turn an alert into a work order a technician can actually execute.
Read MoreGE Proficy Adds Agentic AI Orchestration for 2026 — Here’s What to Actually Pilot First
GE Proficy has added agentic AI orchestration features to its 2026 product roadmap. Here’s a vendor-neutral way to figure out what actually works with your existing data model versus what’s still marketing.
Read MoreNot Every CISA ICS Advisory Is a Fire Drill: A Triage Method for Secure-by-Design Findings
CISA’s secure-by-design language is showing up inside ICS advisories themselves, and plants need a repeatable way to decide what actually demands a shutdown versus what compensating controls can hold until the next PM window.
Read MoreVDA 5050 Is Finally Real: What Mixed-Vendor AMR Fleets Mean for Your MES
VDA 5050 v2.1 has moved from pilot curiosity to procurement requirement, letting plants mix AMR vendors on one control layer — but the spec only covers the wire protocol, not the hard parts your MES still has to solve.
Read MoreAI Code Assist in TIA Portal and Studio 5000: Where to Trust It and Where to Check Its Work
AI code-assist plugins are landing in TIA Portal and Studio 5000 faster than most plants have a review process for them. Here’s a practitioner’s guide to what to accept, what to distrust, and how to check the work.
Read MoreLot Traceability in 90 Days: A Practical Path That Doesn’t Require a Genealogy Overhaul
If a customer or auditor is going to ask for a trace report before your genealogy rebuild is even scoped, here’s how to get lot-level traceability working with what you already have.
Read MoreIgnition 8.3 as Your Historian: A Hands-On Look at Whether It Can Finally Replace PI or Canary
Ignition 8.3’s GA release, with its rebuilt Perspective module and expanded edge/cloud licensing, has plant IT teams asking whether they still need a separate historian. Here’s a practitioner’s scoring of the tradeoffs.
Read MoreDon’t Let Regulators Redesign Your MES Genealogy Model
Three regulatory regimes are converging on manufacturers at once, and the reflex to shove every new compliance field into MES genealogy tables is the wrong move. Here’s a framework for deciding what actually belongs where.
Read More