Dashboards that disagree with the shop floor almost always trace back to OPC UA configuration issues nobody load-tested before cutover. Here’s the validation protocol to run first.
Read MoreDay: July 28, 2026
Edge Historian or Edge MES? Sorting Out What Ignition Edge, Kepware Edge, HighByte, and AVEVA Edge Actually Do
Every edge box on the market now claims to be “MES-ready,” but buffering depth, store-and-forward logic, and transformation capability differ enough that the choice isn’t cosmetic. Here’s how to actually evaluate them.
Read MoreDigital Twin Fidelity Tiers: Stop Building the Twin You Can Afford Before You Know What It’s For
Plants keep buying digital twin fidelity they don’t need or skipping fidelity they can’t do without, because nobody asked what decision the twin is supposed to support. Here’s a framework for getting that match right.
Read MoreProficy After the Split: What GE Vernova’s MES Roadmap Means for Your Next Renewal
GE Vernova has repositioned Proficy as a standalone industrial software line with a visible tilt toward electrification and grid-hardware manufacturing. Here’s what actually changed, and the due-diligence questions worth asking before your next renewal.
Read MoreWhere to Put the Signature: Designing E-Signature Logic for Batch Records in MES
As low-code MES batch execution modules push e-signature configuration onto plant IT teams for the first time, here’s how to draw the line between what needs a signature and what just needs a record.
Read MoreYour OT Recovery Plan Has an RTO Number Nobody Has Ever Tested
Manufacturers are writing OT recovery time objectives into insurance forms and security questionnaires without ever timing a real MES-to-PLC restore. Here’s what a tested plan actually requires.
Read More