A practical, configuration-level guide to building a structured shift-handoff workflow inside your MES — what fields to surface, how to force acknowledgment, and how to keep it from turning into another ignored alert feed.
Read MoreDay: July 27, 2026
Your Historian Is the Bottleneck Now: A Buyer’s Framework for the Cloud-MES Era
As Opcenter X, Plex/Optix, and AVEVA CONNECT push plants toward cloud-connected MES, the historian layer underneath is becoming the real constraint. Here’s a practical framework for deciding whether to keep, augment, or replace it.
Read MoreCarbon as a Sixth Loss: How to Bolt Energy Intensity Onto Your MES Before CSRD Hits the Floor
CSRD and CBAM are turning sustainability reporting into a shop-floor systems problem, and the fastest way to auditable carbon numbers is to model energy loss the same way you already model OEE loss — not to build a parallel spreadsheet system.
Read MoreRockwell Pushes Optix-to-Plex Convergence: What It Means for Your Next MES Renewal
Rockwell is accelerating the data path between FactoryTalk Optix and Plex Manufacturing Cloud, forcing plants at renewal time to choose between a converged architecture and a best-of-breed layer between HMI and MES.
Read More