CISA’s secure-by-design pledge has turned into vendor attestation paperwork showing up in 2026 procurement cycles. Here’s a practical rubric for telling substantive commitments apart from marketing copy — and RFP language that forces vendors to be specific.
Read MoreMonth: July 2026
AR Work Instructions Are Ready to Scale — Is Your MES Ready to Own Them?
Smart-glasses hardware has finally caught up to the shop floor, but scaling AR work instructions past a pilot line is a data-architecture problem, not a device problem. Here’s how to evaluate whether your MES is actually ready.
Read MorePLCopen Motion Control: What You Actually Gain (and Still Lose) by Standardizing Across Siemens, Rockwell, and Beckhoff
Standardizing motion code on PLCopen function blocks genuinely reduces cross-plant maintenance pain, but it doesn’t erase vendor lock-in — it just moves the lock-in down to the drive parameter level. Here’s how to think about the migration honestly.
Read MoreFixing Your Scrap-Reason Codes Before You Fix Your Traceability Data Model
Most scrap-code lists fail because they were designed for a report, not a thumb on a touchscreen. Here’s a practical method for rebuilding one operators will actually use.
Read MoreHistorians in the AI Era: Rethinking Canary and Seeq Against AVEVA and GE Proficy
As historian vendors reposition around AI and analytics, plant teams face a real architectural choice between tag-based enterprise stacks and usage-priced, analytics-first platforms. Here’s how to actually compare them.
Read MoreEvery MES Renewal Now Comes With an AI Line Item — Here’s How to Actually Price It
Nearly every MES and historian vendor has attached an AI copilot SKU to 2026 renewal quotes. Here’s a framework for pricing it against measured value instead of vendor productivity claims, and the contract terms that actually matter.
Read MoreRockwell’s Software Consolidation Hits Renewal Season: What Plex and FactoryTalk Customers Should Ask For Now
Rockwell’s multi-year push to merge Plex, Fiix, Verve, and its FactoryTalk MES lines into one software narrative is now landing squarely in customer renewal quotes — here’s the checklist practitioners need before they sign.
Read MoreMES or MOM? What a Job Post or RFP Is Actually Asking You to Build
MES and MOM used to describe two different levels of scope. In 2026, vendors and job postings use the terms almost interchangeably — here’s how to read what’s actually being asked of you.
Read MoreYour Zone-and-Conduit Diagram Isn’t Evidence Anymore
OEMs are starting to demand proof of IEC 62443 segmentation and access control, not just a network diagram — here’s what evidence actually holds up and how to start building it now.
Read MoreAgentic AI in MES: Who Decides What the Software Is Allowed to Do
Vendors are moving from MES copilots that answer questions to agents that take real actions — releasing orders, adjusting schedules, triggering holds. Here’s a permission model to build before you flip that switch, not after.
Read More