Most genealogy gaps don’t happen mid-run — they happen at changeover, when nobody trusts the system enough to skip a manual re-scan. Here’s how to configure event-triggered lot linkage so the data captures itself.
Read MoreDay: August 14, 2026
Do You Still Need a Historian Once You’ve Got a UNS
Purpose-built historians and general-purpose time-series databases now genuinely compete for the same budget line. Here’s how to figure out which workloads on your floor actually need historian-grade guarantees — and which don’t.
Read MoreYour OEE Number Is Lying to You About High-Mix Lines
A single static ideal cycle time per asset makes high-mix lines look chronically broken and hides genuine improvement. Here’s a practitioner playbook for building SKU-aware, changeover-aware OEE inside the MES and historian you already have.
Read MoreSAP’s ECC Deadline Is Quietly Turning S/4HANA Migrations Into MES Decisions
SAP’s ECC end-of-mainstream-support deadline is pushing manufacturers into S/4HANA migration planning right now — and SAP is using that moment to pull Digital Manufacturing deeper into shop-floor territory. Here’s how to keep the ERP timeline from silently making your MES decision for you.
Read MoreTakt Time, Cycle Time, and Throughput Are Not the Same Number — Stop Configuring Your MES Like They Are
Takt time, cycle time, and throughput answer three different questions, but they get used interchangeably in planning meetings and MES configuration alike — with consequences for staffing, bottleneck identification, and scheduling logic.
Read MoreYour OT Asset List Is About to Become a Legal Document
CISA’s CIRCIA rulemaking is turning OT asset inventory from a security nice-to-have into a compliance obligation with a reporting clock. Most plants’ inventories aren’t built for that — here’s how to fix them before an incident forces the issue.
Read MoreYour AMR Fleet Just Outgrew Its Fleet Manager
As plants scale past pilot AMRs into mixed fleets of 20 or more robots, the real bottleneck is traffic arbitration between fleet managers that don’t talk to each other — and VDA 5050 is finally making a neutral coordination layer practical.
Read MoreOPC UA FX Is Finally Real: A Practitioner’s Guide to Where It Belongs in Your Next Cell
OPC UA FX is moving from spec to shipping silicon in 2026. Here’s a practitioner’s checklist for deciding what it should replace in your next cell design — and what it still can’t touch.
Read More