Low-code tools have made it trivial to kill a spreadsheet-and-clipboard workflow in a week — which is exactly why plants now have thirty disconnected apps and no idea which ones actually need to be real MES modules.
Read MoreDay: August 8, 2026
Gartner’s 2026 MES Magic Quadrant Reshuffles Around AI Claims and M&A Fallout — Here’s How to Read It
Gartner’s latest MES Magic Quadrant leans harder on AI-copilot capability and cloud-native architecture, and the map has moved after a run of vendor consolidation. Here’s what’s real, what’s marketing, and how to build an RFP shortlist from it.
Read MoreYour Vendor Just Sent a Secure-by-Design Attestation Letter. Here’s What to Do With It
CISA’s Secure by Design pledge is starting to show up as real paperwork in ICS vendor renewal packets. Most plant IT teams have no idea what to do with it — here’s a framework that turns those letters into leverage.
Read MoreVDA 5050 Is Everywhere in AMR RFPs Now — Here’s What It Actually Federates
VDA 5050 has gone from early-adopter checkbox to default RFP language, but the spec only unifies part of the AMR interoperability problem. Here’s what it covers, what still needs MES, and how to buy your next robot so it actually federates.
Read MorePackML Off the Packaging Line: Making the State Model Work on Assembly and Machining Cells
Plant engineers are pulling PackML’s state model out of packaging and applying it to assembly, machining, and test cells to standardize line-integration semantics. Here’s a practical guide to where that mapping holds up and where it doesn’t.
Read More